We design, plan and build new builds across Tooting Bec and the wider Wandsworth borough — one team, one fixed price, one project manager from sketch to handover.
Typical scope 120–320m² typical
Cost guide From £3,000 / m²
Build time 12–24 months end-to-end
Consult Free feasibility chat
Local advantage
Why Tooting Bec homeowners choose DPS for new builds.
01 · LOCAL KNOWLEDGE
We know the Wandsworth planning quirks.
Conservation areas, Article 4 directions, party-wall hotspots — every Wandsworth street has its own permission map.
We have submitted dozens of approved schemes across Tooting Bec and the surrounding postcodes.
02 · ONE TEAM
Architects, builders, project managers — all in-house.
No subcontractor juggling. From the first sketch through structural engineering to final snagging, your project moves
through people who all sit in the same office and answer to the same project manager.
03 · TRANSPARENT PRICING
From £3,000 / m² — itemised and fixed.
You pay in stages, only after each stage is signed off. Variations only happen when scope genuinely changes — and
they go through written authorisation, never a verbal "while we are at it".
Yes — Tooting Bec (SW17) is well within our Wandsworth working area. We typically deliver several new builds projects across this borough each year.
How long does a new builds project take in Tooting Bec?
End-to-end (consultation → handover) usually 12–24 months end-to-end. Build phase alone is shorter — most new builds sites complete in 8–18 weeks depending on scope and finishes.
What does new builds cost in Tooting Bec?
Typical range: From £3,000 / m². Our online calculator gives you a tighter figure based on your house type and ambitions; the fixed quote follows a free site visit.
Will I need planning permission in Tooting Bec?
It depends on the property. Many new builds fall under permitted development, especially in Wandsworth. Where planning is needed (conservation areas, listed properties, larger schemes), we handle the application end-to-end.
Do I need an architect before contacting you?
Not necessarily. We have in-house design partners or can work with your architect from RIBA stage 1 onwards.
How long does a new build take?
Typically 12–18 months from breaking ground for a single dwelling, 18–24 months for multi-unit. Add 4–8 months for design and planning.
What is a typical budget?
In London, expect £2,400–£3,200 per square metre for a finished new build to a high standard. We provide detailed cost plans during design.